El Toro Road Traffic and Landscape Improvements Project EIR
3 Documents in Project
Summary
SCH Number
2002031064
Lead Agency
City of Lake Forest
Document Title
El Toro Road Traffic and Landscape Improvements Project EIR
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Retail and service commercial uses are the predominant land use within the study area. The project study area includes Commercial, Professional Office, and residential General Plan designations. The existing zoning designations for the study area are Commercial (CC), Agricultural (A1), Residential (R1, R2), and Lake Forest Planned Community
Document Description
The proposed project is the Toro Road Traffic and Landscape Improvement Project by the City of Lake Forest. The City is proposing to make circulation and landscaping improvements to El Toro Road. The goal of the improvements is to reduce congestion and enhance the aesthetics along the El Toro Road Corridor.
Contact Information
Name
Cheryl Kuta
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency
Phone
Location
Counties
Orange
Cross Streets
El Toro Road/I-5/Muirlands Boulevard
Zip
92630
State Highways
I-5
Railways
OCTA RR
Waterways
Aliso Creek/Serrano Creek, San Diego Creek
Other Location Info
Lake Forest
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 12 (DOT), California Highway Patrol, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Other (road and landscaping improvements)
Local Actions
road and landscaping improvements
Project Issues
Air Quality, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Transportation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.