Mill Creek Diversion Project

3 Documents in Project

Summary

SCH Number
2002031030
Lead Agency
Orange County Water District
Document Title
Mill Creek Diversion Project
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2002
Present Land Use
Open Space
Document Description
SAA #6-2002-91 The applicant proposes to construct diversion project within Mill Creek in order to divert up to 80% of the flow into Splatter "S" Ponds. The water will be retained through wetlands for water quality enhancement, particularly nitrate removal. The diversion structure will consist of a concrete footing that will support a rubber dam inflatable to 1.7 yards high, two stainless steel sluice gated on the east side measuring 3 feet by 5 feet, and a 1,000 foot length of 20-30 inch diameter pipe to deliver gravity flow from the diversion to the existing conveyance channels for the OCWD wetlands and Splatter "S" Ponds. Water from the diversion structure will enter the pipe at an elevation of approximately 509 feet and discharge into the northern conveyance channel at an elevation of 505 feet. A bypass pipeline will maintain at least 20% of the surface flow in Mill Creek, and the 1,000 feet of pipeline will convey flows along an existing dirt road to an open ditch and the wetlands. Water behind the diversion structure will not impound high enough to overspill the creek banks.

Contact Information

Name
Juan Hernandez
Agency Name
Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside
Cross Streets
Hellman Avenue and McCarty Road
Zip
92880
Total Acres
0.1
Parcel #
101-020-003
State Highways
71
Waterways
Mill Creek/Prado Basin
Township
3S
Range
7W
Base
SB

Notice of Determination

Approving Agency
Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.