Evnironmental Initial Study and Negative Declaration for the Recycled Water Project Southeastern Quadrant.

3 Documents in Project

Summary

SCH Number
2002031021
Lead Agency
Olivenhain Municipal Water District
Document Title
Evnironmental Initial Study and Negative Declaration for the Recycled Water Project Southeastern Quadrant.
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2002
Present Land Use
Predominantly vacant land interspersed with single family homes-Santa Fe Valley Specific Plan Area, 4S Ranch Specific Plan Area and Black Mountain Ranch
Document Description
The principal components of the project include a pump station and storage facility at the existing wastewater treatment plant in the 4S Ranch Specific Plan, a pump station and storage facility at the approved wastewater treatment plant in the Santa Fe Valley Specific Plan, and a connection to the OMWD's Raw Water Main Extension 153. Connecting pipelines between these facilities will be constructed entirely within existing rights-of-way and easements. The main connecting pipelines, 18-inch and 16-inch recycled water lines and a 12-inch raw water line, will be constructed mostly in the alignment of Camino del Norte through Black Mountain Ranch and 4S Ranch concurrently with construction of the road, which has been approved by the County of San Diego.

Contact Information

Name
David McCollom
Agency Name
Olivenhain Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Camino del Norte/Camino San Bernardo
Zip
92127
Parcel #
Various
State Highways
15
Township
13S
Range
2,3W
Section
25,30
Base
SB
Other Location Info
Rancho Bernardo/Santa Fe Valley

Notice of Determination

Approving Agency
Olivenhain Municipal Water District
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print