Solids Handling System Improvements at teh District Water Treatment Plant
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002022082
- Lead Agency
- San Juan Water District
- Document Title
- Solids Handling System Improvements at teh District Water Treatment Plant
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/5/2002
- Present Land Use
- The General Plan designation for the proposed project site is Rural Residential/Urban. The land use on the site is currently under a water treatment plant use. This land use would not change under the proposed project.
- Document Description
- Settled solids from sedimentation basins at the SJWD plant are pumped directly to these sludgehandling facilities. Space on the site is limited and it has been a labor-intensive operation to constantly spread and move around sludge to handle production requirements. Mechanical dewatering facilities (belt filter presses) are recommended at the existing water treatment plant site to alleviate these difficulties. The proposed project consists of a new solids handling facility that will consist of sludge thickeners, belt filter presses, a chemical feed system, and return water pumps.
- Contact Information
-
Shauna Lorance
San Juan Water District
Lead/Public Agency
9935 Auburn-Folsom Road
Granite Bay, CA 95746
Phone : (916) 791-0115
Location
- Cities
- Folsom
- Counties
- Sacramento
- Cross Streets
- Auburn-Folsom Road
- State Highways
- 50
- Waterways
- American River
Notice of Determination
- Approving Agency
- San Juan Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- San Juan Water District, 9935 Auburn Folsom Road, Granite Bay, CA 95746
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.