Santa Clara Valley Transportation Authority (SCVTA) Silicon Valley Berryessa Extension (SVBX) (former Silicon Valley Rapid Transit Corridor) - Advanced Utility

37 Documents in Project

Summary

SCH Number
2002022004
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Santa Clara Valley Transportation Authority (SCVTA) Silicon Valley Berryessa Extension (SVBX) (former Silicon Valley Rapid Transit Corridor) - Advanced Utility
Document Type
NOD - Notice of Determination
Received

Document Description
The Operator proposes to relocate existing utilities outside of the SCVTA and UPRR right-of-way (ROW) to allow for the extension of the Bay Area Rapid Transit project referred to as the Silicon Valley Berryessa Extension (SVBX). The utilities to be relocated include a Chevron petroleum line and Verizon (MCI) communications line and will be performed using trenchless technology, such as horizontal directional drilling (HDD) and/or jack-and-bore methods, or by temporarily relocating the communications line on existing/new utility poles or existing bridges/culverts. The DFG is executing a Lake and Streambed Alteration Agreement Number 1600-2011-0049-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Santa Clara Valley Transportation Authority (SCVTA).

Contact Information
Dave Johnston
DFG Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

831 464 6870

Location

Coordinates
37°20'15"N 121°53'15"W
Cities
Santa Clara San Jose Milpitas Fremont
Counties
Santa Clara Alameda
Cross Streets
Multiple
Zip
multiple
Total Acres
~150
Parcel #
multiple
State Highways
Hwy 237,87,880, 689, 91
Railways
UPRR
Airports
no
Schools
multiple
Waterways
multiple
Township
5,6S
Range
1W
Section
10-38
Base
MDM&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No