Sorrento Valley Road Reuse Project
3 Documents in Project
Summary
SCH Number
2002021081
Lead Agency
City of San Diego
Document Title
Sorrento Valley Road Reuse Project
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2003
Present Land Use
Two-lane major street; surrounding properties designated Open Space, zoned AR-1-2 (Agricultural-Residential)
Document Description
City Council approval of street vacation, Torrey Pines Community Plan amendment/Progress Guide and General Plan amendment, Site Development Permit, and potential City acquisition of private property, and California Coastal Commission approval of Coastal Development Permit and Local Coastal Program amendment for the vacation of Sorrento Valley Road, between Carmel Mountain Road and Carmel Valley Road, and the implementation of either the "Pedestrian Trail/Multi-use Path Option" or "Park Road/Multi-use Path Option". The pedestrian Trail/Multi-use Path Option consists of a paved multi-use path, an adjacent soft-surface trail, and a stabilized soil side path along the closed roadway segment. The Park Road/Multi-use Path Option consists of a two-way, limited access road and a stabilized soil side path from the south closure point to City of San Diego Sewer Pump Station No. 65; and a northbound paved vehicle travel lane, a paved multi-use path, and a stabilized soil side path from the pump station to the north closure point.
Contact Information
Name
Analyst Jakubauskas
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Cross Streets
Sorrento Valley Road, Carmel Valley Road and Carmel Mountain Road
State Highways
56
Railways
Amtrak / Coaster
Waterways
Los Penasquitos Lagoon, Carmel Creek, Pacific Ocean
Township
14S
Range
4W
Section
25
Base
SBBM
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.