Sand Creek Business Center

Summary

SCH Number
2002019126
Lead Agency
City of Brentwood
Document Title
Sand Creek Business Center
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2002
Document Description
As part of the development of 11.3 acres into a business center, the operator proposes to install a 48 inch outfall structure on the south bank of Marsh Creek in Brentwood, Contra Costa County. Marsh Creek is a perennial creek located north of Sand Creek Road, approximately 140 feet east of the East Bay Regional Park trail connection. The existing outfall structures on the south bank, an 18 inch outfall structure located approximately 20 feet east of the trail, and the EECID 24 inch outfall along the eastern property line, will both be removed and the south bank will be restored. The proposed 48 inch outfall structure will be installed according to the Contra Costa County Modified B-50 design. Approximately 600 square feet of riprap will be placed on the bank and in the bed of the creek around the pipe. Grout will be used only in the flow line portion of the riprap. All other riprap shall be left loose and covered with soil. The project is located on the south bank of Marsh Creek in Brentwood, Contra Costa County. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2001-0910 pursuant to Section 1603 of the Fish and Game Code to the project operator, Michael Conley/CP Management, LLC.

Contact Information

Name
Greg Martinelli
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Brentwood
Counties
Contra Costa

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print