Pcifica Village Center EIR

4 Documents in Project

Summary

SCH Number
2002012105
Lead Agency
City of Pacifica
Document Title
Pcifica Village Center EIR
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2002
Present Land Use
The site was quarried for rock and is known as the Pacifica Quarry site. The western portion of the site (west of Calera Creek) has steep slopes and an abandoned retention pond. The eastern portion of the site is relatively flat. The site contains herbaceous vegetation, brush and trees. The site is zoned C-3x, HPD (Hillside Preservation District). The "x" means that a public vote is required for residential development. The General Plan designation is Special Area.
Document Description
The mixed-use project includes retail, residential, a hotel/conference center, and civic use to create a "village center". Uses would include stand alone retail shops; residential over retail and restaurants configured along a traditional "main street"; Land set aside for the City of Pacifica to build a civic building; a town square; and a mix of single-family detached, attached and town home residences.

Contact Information

Name
Allison Knapp Wollam
Agency Name
City of Pacifica
Contact Types
Lead/Public Agency

Location

Cities
Pacifica
Counties
San Mateo
Cross Streets
Highway 1 and San Marlo Way
Zip
94044
Total Acres
87.5
Parcel #
018-150-110, 018-150-120, and 018-150-150
State Highways
Highway 1
Schools
Linda Mar Elementary School , Ingrid B. Lacy Middle School
Waterways
Pacifica Ocean , Calera Creek, and Laguna Salada
Township
4S
Range
4W
Base
MMCAL
Other Information
Terra Nova High School

Notice of Determination

Approving Agency
N/A
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print