Water Treatment and Distribution Project

4 Documents in Project

Summary

SCH Number
2002012050
Lead Agency
City of Calistoga
Document Title
Water Treatment and Distribution Project
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2002
Present Land Use
Various-Agricultural (Napa County), Rural Residential, Low and Medium Density Residential (City of Calistoga)
Document Description
The project consists of four components: 1) replacement of an existing main with an approximately 10,100 foot long, ten-inch diameter main leading from the Kimball Treatment Plant to a connecting main at the intersection of Tubbs Lane and Myrtledale Road; 2) replacement of an obsolescent main with an approximately 5,200 foot long, ten-inch diameter main along Myrtledale Road/Grant Street; 3) Kimball Water Treatment Plan improvements to the clarifier, access to the clarifier, and adding flow meters and turbidimeters to the filter bank; and 4) Kimball Reservoir improvements, including construction of a flow measurement system on each of two creeks discharging into the reservoir, a flow meter on the diversion from the outlet tower to the treatment plant, a flow meter on the bypass line to Kimball Creek, and replacement of the wooden flashboards with an inflatable dam to provide for a safer means of containing additional water behind the dam after the winter flows have ceased and of regulating excess flows over the reservoir spillway.

Contact Information

Name
Rick Tooker
Agency Name
Napa County Clerk
Contact Types
Lead/Public Agency

Location

Cities
Calistoga
Counties
Napa
Zip
94515
Total Acres
9.6+/-
State Highways
29/128
Airports
Abandoned Gliderport
Schools
Elementary and Junior/High
Waterways
Napa River

Notice of Determination

Approving Agency
City of Calistoga
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print