Addendum No. 2 to the Facilities Master Plans Program Environmental Impact Report for the Wineville Recycled Water Pipeline Project

29 Documents in Project

Summary

SCH Number
2002011116
Lead Agency
Inland Empire Utilities Agency
Document Title
Addendum No. 2 to the Facilities Master Plans Program Environmental Impact Report for the Wineville Recycled Water Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2014
Document Description
Note: Addendum The proposed Wineville Recycled Water Pipeline Project is being developed by the Inland Empire Utilities Agency (IEUA or Agency) in cooperation with the City of Fontana and the Fontana Water Company. This project is a second-tier project (Phase II) being implemented under the Recycled Water Master Plan element of the Agency's Facilities Master Plans (FMP) Program Environmental Impact Report (PEIR). The IEUA's goal is to reuse, to the extent practicable, recycled water that is produced at IEUA's Regional Wastewater Reclamation Facilities (WWRFs). Primary goals are to reduce dependency of the Chino Basin on imported State Water Project (SWP) water; to offset pumping that exceeds the Basin's safe yield; and to improve groundwater quality in the Basin. Earlier this year contract was issued to Mike Bubalo Construction Co., Inc. for the construction of the Wineville Segment "B" recycled water system. As part of the Company's due diligence, it conducted a "value engineering" assessment of the original Wineville recycled water pipeline alignments. As a result of this value engineering assessment, the Company suggessted that IEUA consider an alternative alignment for a portion of the Segment B alignment. After careful review, IEUA concluded that Option A would meet the objectives of providing recycled water to local public landscaped areas and it would reduce the total lineal footage of recycled water pipeline to be installed by approximately 2,400 lineal feet. At this point IEUA requested an environmental evaluation of the potential environmental effects of installing the Option A alignment of the Wineville Recycled Water Pipeline alignment compared to that approved by both IEUA and the State Board. This Addendum has been prepared to address the Option A alignment.

Contact Information

Name
Adham Almasri
Agency Name
Inland Empire Utilities Agency
Contact Types
Lead/Public Agency

Location

Cities
Chino Hills, Fontana
Counties
San Bernardino
Cross Streets
Galloping Hills Rd
Total Acres
~10
Jobs
1800
State Highways
SR 71
Waterways
Little Chino Creek
Township
2S
Range
8W
Section
No
Base
SBB&M

Notice of Determination

Approving Agency
Inland Empire Utilities
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.