Fontana-3 Pipeline Laterals Recycled Water Pipeline Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5318-110 Water Recycling Funding Progra

29 Documents in Project

Summary

SCH Number
2002011116
Lead Agency
Inland Empire Utilities Agency
Document Title
Fontana-3 Pipeline Laterals Recycled Water Pipeline Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5318-110 Water Recycling Funding Progra
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2014
Document Description
The Agency's Project for the Central Project Area includes the Jurupa (Wineville) Extension Recycled Water Pipeline, which is part of the Agency's Regional Recycled Water Distribution System. The Project will design and construct a pipeline segment of 5,200 linear feet (LF) OF 24-inch recycled water pipeline along the Day Creek Channel between Airport Drive and Jurupa Street and a segment of 28,500 LF of 36-inch recycled water pipeline adjacent to the Wineville Flood Control Basin between Jurupa Street and East Francis Street within the City of Ontario. The 24-inch pipeline will parallel an existing 24-inch recycled water pipeline along Day Creek Channel. The 36-inch pipeline will extend from East Francis Street, which becomes Marlay Avenue, and continue along Cherry Avenue, Live Oak Avenue, and Village Drive to the Declez Channel and will terminate at RP-3 within the City of Fontana. The pipeline will include two large turnout facilities, which are located along the Declez Channel and RP-3 to supply recycled water for groundwater recharge, and a smaller turnout that will provide irrigation to one of the cells within the RP-3 recharge site. The Project will also serve recycled water customers within the Cities of Ontario and Fontana. The estimated connected demand is approximately 275 acre-feet per year (AFY) for direct usage and 1000 AFY for groundwater recharge. The Project will also include retrofits of public sites, such as, schools, parks, and streetscapes. Customer retrofits will require an evaluation of the existing piping at each site, design plans to modify the piping at the site from potable to recycled water, an engineering report approved by the California Department of Public Health, and construction of the site retrofits and cross connection testing once the site is retrofitted.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Chino Hills, Fontana
Counties
San Bernardino
Cross Streets
Galloping Hills Rd
Total Acres
~10
Jobs
1800
State Highways
SR 71
Waterways
Little Chino Creek
Township
2S
Range
8W
Section
No
Base
SBB&M

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.