Installation of the Fontana-3 Pipeline Laterals Recycled Water Pipeline Project

29 Documents in Project

Summary

SCH Number
2002011116
Lead Agency
Inland Empire Utilities Agency
Document Title
Installation of the Fontana-3 Pipeline Laterals Recycled Water Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2008
Present Land Use
Variable
Document Description
This project includes a short segment of the Jurupa Regional Recycled Water Pipeline and two alternative alignments of the Fontana-3 regional recycled water pipeline and laterals from this regional pipeline. The project also includes the installation of recycled water pipelin ranging between 6 inches and 48 inches in diameter and between 36,225 and 38,647 linear feet in length, which will occur within paved public roadways and curbs and gutters and within compacted dirt access road right of ways. The laterals would deliver recycled water for irrigating large landscaping areas of the publicly owned park and school properties in the southern portion of the City of Fontana that can use the recycled water for irrigation purposes.

Contact Information

Name
Chuck Hays
Agency Name
City of Fontana
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Cross Streets
Interstates 15 and 10
Jobs
1800
State Highways
I-10 & 15
Railways
UP & BN
Airports
Ontario International
Waterways
Several, including Santa Ana River

Notice of Determination

Approving Agency
City of Fontana
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print