California Army National Guard Bridge Replacement

5 Documents in Project

Summary

SCH Number
2001124004
Lead Agency
California Army National Guard
Document Title
California Army National Guard Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2010
Present Land Use
Public Facility
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, California Army National Guard. The applicant proposes removing an abandoned wooden bridge deck, abandoned sewer line, and two (2) concrete bridge footing from the Chorro Creek channel. The sewer pipe would be capped at each end and the bridge deck sawn into smaller sections. A crane would be used to remove the sections of bridge deck and sewer pipe. The stream would be diverted using sandbags and two (2) concrete footing would be removed from the channel by cutting the footing approximately 6-inches above the stream bed and lifting the cut sections out of the channel. One (1) mature willow, one (1) mature sycamore, and several poison oak bushes would be trimmed to allow worker and equipment access to the site. All material would be removed and disposed of off-site. Equipment used will include a crane, hand tools (drills, cutting equipment), and haul trucks.

Contact Information

Name
Darryl J. Balcao
Agency Name
California Army National Guard
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Kern Road
State Highways
SR 1
Waterways
Chorro Creek
Township
30S
Range
12E
Section
9
Base
MDB&M

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.