Buckhorn Water Treatment Plant and Pump Stations Replacement Project

4 Documents in Project

Summary

SCH Number
2001122072
Lead Agency
Amador Water Agency (AWA)
Document Title
Buckhorn Water Treatment Plant and Pump Stations Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2002
Present Land Use
Buckhorn WTP Replacement Site: Water Treatment/R1B3 "single family residential"/RS "Residential Subruban" Tiger Creek Pump Station: Water Supply/R1A "single family residential & agriculture district"/OR "open recreation" Silver Lake Pines Pump Station: Water Supply/R1 "county easement"/RS "residential suburban" Backwash Pipe: Water Treatment/PD "planned development"/SP "special planning".
Document Description
Replacement of the Buckhorn Water Treartment Plant and upgrade and modify the existing Tiger Creek and Silver Lake Pines Pump Stations including building a new 3 MGD (expandable to 5MGD) Water Treatment Plant and Pump Station upgrades for the CAWP system to meet current and future regulations and improving water supply reliability. The proposed plant includes the construction of two above ground 250,000-gallon water storage tanks, an 80,000 gallon equalization basin, a surge control/break tank and an 8,900 sq. ft. new treatment and maintenance building, necessary piping and facilities to support membrane treatment, pumping facilities, and telemetry upgrades to monitor and control remote tank and pressure reducing sites. Replacement of approximately 1300 feet of an existing backwash line and modification and replacement of the telemetry system at each of the 22 existing tanks, 3 pressure reducing stations and 1 other pump station. The project also includes applying to the State Water Resources Control Board for additional Water Rights.

Contact Information

Name
Gen Mancebo
Agency Name
Amador Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Amador
Cross Streets
Hwy. 88, Tiger Creek Rd., Forest Oak Rd.
Zip
95666
Total Acres
2.16+
Parcel #
33-160-008, 33-010-024
State Highways
88
Waterways
Mokelume River
Township
7N
Range
13E
Section
22/23
Base
M.D.M.
Other Location Info
Pioneer

Notice of Determination

Approving Agency
Amador Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.