Anderson Creek Bridge Replacement

4 Documents in Project

Summary

SCH Number
2001122063
Lead Agency
California Department of Transportation, District 3
Document Title
Anderson Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2003
Present Land Use
Highway 128, Rural Residential and Rural Community
Document Description
The proposed project is the replacement of the Anderson Creek Bridge at PM 28.2 on State Route 128 near the town of Booneville in Mendocino County. The existing bridge is a three-span concrete slab and steel girder structure on spread footings. The proposed new structure will completely span Anderson Creek with a three lane single-span structure. Anderson Creek is a perennial stream and a stream diversion will be necessary during the construction window. The proposed stream diversion will be accomplished with a series of 18" - 36" diameter culverts placed at grade. A layer of visquine fabric will be placed over the culverts and then covered with a layer of gravel to create the work pad / crossing to install the bridge false work. Large equipment will need to access Anderson Creek from both sides of the bridge since the bridge may not be high enough for equipment to pass under it. The access from the downstream side of the bridge will result in the loss of some riparian vegetation, primarily alder, willow, and maple.

Contact Information

Name
Keith Herron
Agency Name
Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Cities
Booneville
Counties
Mendocino
Cross Streets
Highway 128/Mountain View Road
Zip
95415
State Highways
128
Airports
Boonville
Schools
Anderson Valley High School
Waterways
Anderson Creek
Township
13N
Range
14W
Section
2

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print