Marshall Drain Recovery Reservoir Project

2 Documents in Project

Summary

SCH Number
2001122057
Lead Agency
San Joaquin Valley Drainage Authority
Document Title
Marshall Drain Recovery Reservoir Project
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2002
Document Description
The proposed Project involves the purchase of land and the design and construction of a 15-20 acre spill and drainage water recovery basin on developed agricultural land located adjacent to the Marshall Road Drain. The Marshall Road Drain collects canal operational spill water and surface drainage from a 6,800 acre agricultural area surrounding the Drain. The reservoir design will necessitate the construction of levees for the proposed reservoir, control structures, and pumping facilities as required to divert the existing drain flow into the reservoir, and to allow water to be re-diverted as required into an existing irrigation delivery canal. The drain water is currently discharged into the San Joaquin River. The goals of the project are to a) reduce the silt loading to the San Joaquin river, b) reduce the Organophosphorus Pesticides in drainage water discharged to the San Joaquin River, c) reduce the constituents that adversely affect the dissolved oxygen level within the San Joaquin River, and d) develop new water through the construction of an operational spill and tailwater recovery reservoir to further improve the local efficiency of water management.

Contact Information

Name
Frances Mizuno
Agency Name
San Joaquin Valley Drainage Authority
Contact Types
Lead/Public Agency

Location

Cities
Patterson
Counties
Stanislaus
Cross Streets
Marshall Road-Armstrong Road
Total Acres
15-20
State Highways
33
Railways
Southern Pacific
Waterways
San Joaquin River
Township
6S
Range
R&E
Section
10
Base
MDB&M

Notice of Determination

Approving Agency
San Joaquin Valley Drainage Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.