San Joaquin Reservoir Conversion Project
6 Documents in Project
Summary
SCH Number
2001121098
Lead Agency
Irvine Ranch Water District
Document Title
San Joaquin Reservoir Conversion Project
Document Type
FIN - Final Document
Received
Document Description
IRWD proposes to convert the existing San Joaquin Reservoir to reclaimed water storage to allow IRWD to maximize the use of reclaimed water through additional seasonal storage. Major design components required to convert the San Joaquin Reservoir include 1. Modifications to the reservoir for repairs; 2. Construction and operation of three pump stations, one at the reservoir and two offsite; 3. Construction of less than one mile of reclaimed water pipeline; and 4. Construction of a disinfection facility at the reservoir. Construction of the proposed project is anticipated to begin in 2003 and be completed by 2005.
Contact Information
Name
Michael Hoolihan
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Newport Beach
Counties
Orange
Cross Streets
Bonita Canyon Dr. / Hwy. 73 Sand Canyon Ave. / I-405
Zip
92708
Total Acres
60
State Highways
73 and I-405
Schools
Univ. of California - Irvine
Waterways
Unnamed Drainage
Notice of Completion
Development Types
Other (Repair to existing reservoir & associated facilities)
Local Actions
Site Plan
Project Issues
Air Quality, Cumulative Effects, Drainage/Absorption, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Vegetation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.