Hesperia Water District's Water and Sewer Master Plan Project

3 Documents in Project

Summary

SCH Number
2001121084
Lead Agency
Hesperia Water District
Document Title
Hesperia Water District's Water and Sewer Master Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2003
Present Land Use
Variable
Document Description
The HWD is mandated to provide an adequate supply of potable water and provide wastewater collection and transmission services to customers within its service area. The most efficient and economical method of identifying and implementing specific projects needed to provide these services is through the preparation of master plans, which identify current and anticipated future demand for services and which identify the systems improvements needed to meet future demand in an incremental manner as population grows within the District's service area. By preparing master plans, the service agency can anticipate the location and type of improvements that will be required in the future and can establish a preliminary schedule for when these improvements will be needed. The master plans also provide an overview of the entire service area that allows logical expansion of facilities that are compatible with existing and anticipated future population growth and related demand for capacity in these systems.

Contact Information

Name
Michael Podegracz
Agency Name
Hesperia Water District
Contact Types
Lead/Public Agency

Location

Cities
Hesperia
Counties
San Bernardino
Cross Streets
Interstate 15, State Highway 395 and SH 18
State Highways
Interstate 15, Hwy 395/SH 18
Railways
Burlington Northern Santa Fe
Airports
Hesperia Airport
Waterways
Mojave River
Township
3N
Range
4/5W

Notice of Determination

Approving Agency
Hesperia Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print