NanoSystems and Engineering Facilities Plan

4 Documents in Project

Summary

SCH Number
2001121064
Lead Agency
University of California, Los Angeles
Document Title
NanoSystems and Engineering Facilities Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2003
Present Land Use
Campus
Document Description
The project would construct a five-story, approximately 100,000 gsf Engineering 1 Replacement Building in the Core zone of the UCLA campus. The Engineering 1 Replacement Building would include research and instructional laboratories with about 100 fume hoods (80 net new fume hoods); biomedical engineering core facilities; and office, conference, seminar space, and a machine shop. To accommodate construction of the replacement building, the 60,000 gsf Engineering 1 Unit B Building would also be demolished. A landscaped/ turf area would be provided in the western portion of the site previously occupied by the Unit A Building. The project also includes utility infrastructure changes. Construction is scheduled to begin Spring/ Summer 2003 and last approximately 35 months.

Contact Information

Name
Tova Lelah
Agency Name
University of California, Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Veteran Avenue and Wilshire Boulevard
Zip
90095
State Highways
I-405

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print