Southside Road Bridge Crossing

3 Documents in Project

Summary

SCH Number
2001121030
Lead Agency
San Benito County
Document Title
Southside Road Bridge Crossing
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2002
Present Land Use
Agricultural Productive/Floodplain
Document Description
The proposed project is to construct a new bridge crossing for Southside Road, over Tres Pinos Creek, and to replace an existing deficient bridge, using funds provided by the Federal Highway Administration (FHWA). The existing bridge is structurally deficient and functionally obsolete. The new bvridge will be a ten-span, 20-inch thick, cast-in-place, concrete flat slab supported by cast-in drilled hole concrete pilings. The dimensions of the new bridge deck will be 32-feet, eight-inches wide and 351-feet long. The new bridge will be located approximately 50 feet north (upstream) on the western end, and 150 north of the eastern end of the existing Southside Road bridge, and will require new abutments to be constructed. 1/4 ton rock slope protection will be installed to protect the new abutments. the adjoining portions of Southside Road (County Road No. 86) would be aligned to connect with the new bridge structure. The existing steel truss bridge and piles will be removed upon completion of the new bridge.

Contact Information

Name
Rob Mendiola
Agency Name
San Benito County Public Works Dept.
Contact Types
Lead/Public Agency

Location

Counties
San Benito
Cross Streets
Southside Road/Thomas Road
State Highways
25
Schools
Southside
Waterways
Tres Pinos Creek
Other Location Info
Tres Pinos

Notice of Determination

Approving Agency
San Benito County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes