Streambed Alteration Agreement R3-2001-0747

Summary

SCH Number
2001119009
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement R3-2001-0747
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2001
Document Description
The project includes installation and subsequent removal of a Spittler-type temporary crossing in a Class II stream at location X1 identified in the approved Timber Harvest Plan. The proposed crossing is intended to provide access to a portion of the harvest area for THP 1-01-167 SMO. Two or more logs approximately 15 to 20 feet long will be placed in the channel over a layer of straw. A flexible conduit at least four inches in diameter will be placed below and between the logs to conduct any water that may be present. A layer of straw will be placed on top of the logs, and then covered by a layer of soil. The completed crossing will be used for log skidding during harvesting operations. This crossing is temporary and will be used only during the summer and/or early fall of 2002. Following completion of harvesting operations, or prior to October 15, 2002, whichever comes first, all material placed in the stream channel will be removed and the stream channel and banks restored to original grade. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement R3-2001-0747, pursuant to Section 1603 of the Fish and Game Code to the project applicant, Roy Webster, Webster & Associates.

Contact Information

Name
Kent Aue
Agency Name
Department of Fish and Game #3
Contact Types
Lead/Public Agency

Location

Counties
San Mateo
Waterways
Tunitas Creek
Township
6S
Range
5W
Section
24

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.