Engineering Building Unit 2

2 Documents in Project

Summary

SCH Number
2001111073
Lead Agency
University of California, Riverside
Document Title
Engineering Building Unit 2
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2002
Present Land Use
Public Facilities & Institutions
Document Description
The proposed project is a 153,600 gross square foot building to accommodate multidisciplinary instructional and research laboratories, faculty offices, and administrative office support space for programs in Computer Sciences and Engineering and Electrical Engineering. In addition, the project will provide new general assignment classrooms for the campus. The proposed site for Engineering Building Unit 2 is located on Parking Lot 16 east of the existing College of Engineering Bourns Hall. The site is bordered on the south by the Geology Building, on the southeast by the Physics Building, and on the north by North Campus Drive, the Arroyo and the residence halls.

Contact Information

Name
John Zimmermann
Agency Name
Regents of the University of California, Riverside
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
North Campus Drive/Aberdeen Drive
Zip
92507
Total Acres
1.5
Parcel #
253-100-002
State Highways
I-215
Railways
AT&SF
Schools
Highland&Hyatt Elementary/University Ht Middle School/North
Township
2S
Range
4W
Section
29
Base
SB

Notice of Determination

Approving Agency
Regents of the University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print