Sewer and Water Group Job 616

3 Documents in Project

Summary

SCH Number
2001111023
Lead Agency
City of San Diego
Document Title
Sewer and Water Group Job 616
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2002
Present Land Use
Public Right-of-Way (streets) and Open Space Canyons
Document Description
Council approval of Capital Improvement Project No. 44-303.8 for the abandonment of approximately 1,300 linear feet of existing 6-inch diameter sewer mains located in both public right-of-way and residential private property, the installation of approximately 3,900 linear feet of new 8-inch diameter sewer mains, laterals, and manholes, the realignment of approximately 500 linear feet of 6-inch sewer main, and the replacement of approximately 600 linear feet of 4-inch, 8-inch and 12-inch diameter water mains and services. New sewer and water main installation would include improvements to service connections, restoration of concrete pavement, installation of pedestrian ramps, slurry seal, restriping and related improvements.

Contact Information

Name
Jeff Thomas
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Brooks Avenue & Curlew Street
State Highways
5,163
Railways
Atchison, Topeka
Airports
San Diego
Schools
Roosevelt Jr. H.S.
Waterways
San Diego Bay
Township
17S
Range
2W
Other Location Info
City: Hillcrest
Other Information
Base: Point Lomp

Notice of Determination

Approving Agency
the City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.