Bledsoe Gulch Erosion Control Project

Summary

SCH Number
2001108222
Public Agency
City of Highland
Document Title
Bledsoe Gulch Erosion Control Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/10/2001
Document Description
The project consists of the construction of a diversion structure approximately 700 feet in length, which will accommodate peak storm flows that are currently eroding the unimproved Bledsoe Gulch stream channel. Nuisance water and land flows will continue within the stream channel.

Contact Information

Name
Steven R. Walker
Agency Name
City of Highland
Contact Types
Lead/Public Agency

Location

Cities
Highland
Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15303 (d)
Reasons for Exemption
The project presents itself as a minor modification to existing conditions. No additional storm flows will be introduced into the drainage. The improvements will divert peak storm flows into an artificial drainage course for a length of approximately 700 feet. This project will create a temporary structure that would be replaced by other improvements upon development of the subject parcel. No sensitive plant or animal species are known or expected to be present on site.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print