Beaver Lumber Company Remedial Action Plan

2 Documents in Project

Summary

SCH Number
2001102129
Lead Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
Beaver Lumber Company Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2001
Present Land Use
Industrial Land Use/Zoning: MG General Industrial/GI General Industrial
Document Description
Several different companies operated various types of wood processing at the site from the early 1920s to the present. Wood treatment chemicals that contained pentachlorophenol (PCP) and other contaminants were used between 1965 and 1983. The site is currently used for remanufacturing of wood products and a composting cottage industry. Site investigation revealed onsite soil, surface water, and groundwater contamination with PCP, tetrachlorophenol, and other breakdown products. The proposed project is a remedial action consisting of excavation and transportation of PCP contaminated soils to a permitted facility followed by the injection of hydrogen peroxide to facilitate the bioremediation of soils.

Contact Information

Name
Kasey Ashley
Agency Name
Regional Water Quality Control Board, Region 1 (North Coast), Sa
Contact Types
Lead/Public Agency

Location

Cities
Arcata
Counties
Humboldt
Cross Streets
5th Street and Samoa Boulevard
Zip
95521
Parcel #
021-201-11
State Highways
101
Waterways
Humboldt Bay

Notice of Determination

Approving Agency
Regional Water Quality Control Board, North Coast Region
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print