California Maritime Academy, Dining Center Replacement, Schematic Plan Approval

4 Documents in Project

Summary

SCH Number
2001102040
Lead Agency
California Maritime Academy
Document Title
California Maritime Academy, Dining Center Replacement, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2011
Present Land Use
Educational
Document Description
The proposed project will design and construct a 25,400 GSF two-story Dining Center that will be constructed on three levels with a 280-seat main dining room on the first floor, a 130-seat dining space on the mezzanine level, and a 290-seat meeting room on the second level that will feature operable partitions to create up to three separate meeting rooms, The building is being designed to achieve LEED Silver certification or better. Sustainable features will include significant day lighting, natural ventilation, and energy efficient HVAC and lighting systems, including daylight and occupancy sensors. Additional features include high performance glazing with solar protection and a durable, long life exterior skin made of brick and metal. The project will also incorporate sustainable kitchen features and operation: Energy Star rated equipment, 80 percent waste reduction volume, and the use of waste heat to preheat domestic hot water.

Contact Information

Name
Mr. Roger Jaeckel
Agency Name
California State University Trustees
Contact Types
Lead/Public Agency

Location

Cities
Vallejo
Counties
Solano
Cross Streets
Sonoma Boulevard/California Maritime Academy Drive
Zip
94590
Total Acres
88
State Highways
I-80/SR 29
Schools
California Maritime Academy
Waterways
Carquinez Strait, San Pablo Bay

Notice of Determination

Approving Agency
Board of Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print