Addendum No. 1 to the Colorado River Aqueduct;

4 Documents in Project

Summary

SCH Number
2001101146
Lead Agency
Metropolitan Water District of Southern California
Document Title
Addendum No. 1 to the Colorado River Aqueduct;
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2004
Present Land Use
Water Distribution System Corridor-Desert Region
Document Description
Addendum No. 2 addresses minor project modifications to the previously approved Colorado River Aqueduct Conveyance Reliability Program, 2002 Shutdown Repairs (Program). Proposed modifications include: removal and replacement of up to an additional 109,000 sf of deteriorated concrete canal liner; replacement of existing cast iron blow-off outlets and valves; installation of internal rubber sleeves in four siphons; repair of concrete sand traps at Iron Mountain, Eagle Mountain, and Hinds pumping plants; installation of a crack monitoring system in the West Iron Habitat tunnel near CRA Mile Marker 75; dewatering and inspection of five siphons for structural integrity; and headgate operator refurbishment at the Intake, Gene, Iron Mountain, Eagle Mountain, and Hinds pumping plants.

Contact Information

Name
Mike Melanson
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Counties
Riverside, San Bernardino

Notice of Determination

Approving Agency
Board of Directors of the Metropolitan Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print