McManus Minor Subdivision; McManus Minor Subdivision; TPM 20609; LOG NO. 01-14-026

3 Documents in Project

Summary

SCH Number
2001101140
Lead Agency
San Diego County
Document Title
McManus Minor Subdivision; McManus Minor Subdivision; TPM 20609; LOG NO. 01-14-026
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2002
Present Land Use
A70 Limited Agriculture- 1du/acre. Land use designation is 1 residential - 1du/1,2,4 gr. Ac.

Document Description
The project proposes to grade approximately 1.0 acre of a 2.8 acre (gross) property for two building pads with a driveway and a private road off of Vista Camino Drive. The grading involves 1800 cubic yards of cut and fill on site. The maximum cut slope ratio is 1.5:1 with a height of 12 feet, while the maximum fill slope ratio is 2:1 with a height of 8 feet. The project is located within the Metro-Lakeside-Jamul segment of the Couny of San Diego Multiple Species Conservation Program (MSCP) Subarea Plan.

Contact Information
Mindy Fogg
San Diego County Department of Planning and Land Use
5201 Ruffin Road Suite B
San Diego, CA 92123

Phone : (858) 694-3831

Location

Counties
San Diego
Cross Streets
Lakeside Avenue and Valle Vista Road
Total Acres
3.21
Parcel #
379-101-21
Range
SBM

Notice of Determination

Approving Agency
San Diego County Department of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
The County of San Diego, Department of Planning and Land Use, Project Processing Counter, 5201 Ruffin Road, Suite B, San Diego, California.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search