San Marcos Landfill Final Closure and Post-Closure Maintenance Plans (UJ1750)

4 Documents in Project

Summary

SCH Number
2001101126
Lead Agency
San Diego County
Document Title
San Marcos Landfill Final Closure and Post-Closure Maintenance Plans (UJ1750)
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2002
Present Land Use
The Landfill stopped receiving waste in 1997. Since that time, activity has been limited to site monitoring and maintenance. The City of San Marcos has assigned a "Solid Waste Management Area" (SWM) General Plan and Zoning Designation to the project site. The proposed project is consistent with the General Plan and zoning designation.
Document Description
Implementing the Final Closure and Post-Closure Masintenane Plans for the San Marcos Landfill using a monolithic soil cover system or other similar system as required by regulatory authorities. The soil cover will range in depth from five (5) feet to eight (8) feet, and require the importation of approximately 420,000 cubic yards of soil over an approximate 7-month period.

Contact Information

Name
Jon Rollin
Agency Name
San Diego County Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
San Elijo Road and Elfin Forest Road
Zip
92123-1141
Total Acres
310
Parcel #
223-080-11, 29, 33, 35, 223-081-08, 223-082-07, 09
Waterways
Copper Creek
Township
12S
Range
3W
Section
33
Base
SBBM

Notice of Determination

Approving Agency
San Diego Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes