San Marcos Landfill Final Closure and Post-Closure Maintenance Plans (UJ1750)

4 Documents in Project

Summary

SCH Number
2001101126
Lead Agency
San Diego County
Document Title
San Marcos Landfill Final Closure and Post-Closure Maintenance Plans (UJ1750)
Document Type
EIR - Draft EIR
Received
Present Land Use
The Landfill stopped receiving waste in 1997. Since that time, activity has been limited to site monitoring and maintenance. The City of San Marcos has assigned a "Solid Waste Management Area" (SWM) General Plan and Zoning Designation to the project site. The proposed project is consistent with the General Plan and zoning designation.
Document Description
The project consists of implementing the Final Closure and Post-Closure Maintenance Plans for the San Marcos Landfill ("Landfill") using a monolithic soil cover system or other similar system as required by regulatory authorities. The soil cover will range in depth from five (5) feet to eight (8) feet. The project will require the importation of approximately 420,000 cubic yards of soil over an approximate 7-month period. The imported soil will be mixed with approximately 120,000 cubic yards of on-site soil and placed over the Landfill surfaces. Closure of the Landfill will be in accordance with requirements from Title 27 of the California Code of Regulations. The Final Closure and Post-Closure Maintenance Plans will require approvals from the County San Diego Board of Supervisors, California Integrated Waste Management Board (CIWMB), San Diego Regional Water Quality Control Board (RWQCB), San Diego Air Pollution Control District (APCD), and County of San Diego Department of Environmental Health, Local Enforcement Agency (LEA).

Contact Information

Name
Julia M. Quinn
Agency Name
San Diego County Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
San Elijo Road and Elfin Forest Road
Zip
92123-1141
Total Acres
310
Parcel #
223-080-11, 29, 33, 35, 223-081-08, 223-082-07, 09
Waterways
Copper Creek
Township
12S
Range
3W
Section
33
Base
SBBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, Resources, Recycling and Recovery, California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Other (Landfill Final Closure and Post-Closure Maintenance Plans)
Local Actions
Landfill final Closure and Post-Closure Maintenance Plans
Project Issues
Air Quality, Hydrology/Water Quality, Noise, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print