Check Dam Installation at Tick Canyon Wash; Check Dam Installation Project at Tick Canyon Wash
6 Documents in Project
Summary
SCH Number
2001101102
Lead Agency
California Department of Transportation, District 7
Document Title
Check Dam Installation at Tick Canyon Wash; Check Dam Installation Project at Tick Canyon Wash
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2003
Present Land Use
Business Park (Mineral/Oil Conservation Area)
Document Description
The California Department of Fish and Game has issued an Agreement Regarding Proposed Stream Alteration (SAA#R5-2002-0349) ("agreement") to Caltrans ("applicant") in conjunction with the applicant's proposal to alter the streambed by installing a check dam in Tick Canyon Wash just south of the State Route 14 bridge to reduce erosion and alleviate scour at the bridge piles. The check dam structure would consist of an underground anchor wall (7 feet downstream of existing bridge railing), a 30-foot side concrete retaining wall (40 feet downstream from the anchor wall), a series of underground rods connecting the anchor wall to the retaining wall, and rock riprap from the retaining wall to 20 feet downstream. All impacted native vegetation in the construction area (0.08 acre of riparian vegetation and 0.14 acre of associated upland vegetation) is currently mitigation for the SR 14 HOV lane project. The Operator proposes to restore a portion of the drainage downstream of the work site, re-plant upland areas as before, and plant native plant cuttings in the riprap.
Contact Information
Name
Barbara Marquez
Agency Name
California Department of Transportation, District 7
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
State Route 14/Soledad Canyon Road
Zip
91351
Total Acres
1 acre
Parcel #
3210-15-22
State Highways
SR-14
Railways
Metrolink
Waterways
Tick Canyon Wash, Santa Clara River
Township
4N
Range
14W
Section
18
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.