El Paso Global Networks California Telecommunication System Project

2 Documents in Project

Summary

SCH Number
2001101064
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
El Paso Global Networks California Telecommunication System Project
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2002
Present Land Use
project is located in existing road and highway rights-of-way
Document Description
The project involves the construction and operation of an underground fiber optic telecommunication system between the California/Arizona border and Blythe and Los Angeles, California. The proposed project would involve the placement of fiber optic conduit and cable within previously disturbed areas within existing rights-of-way, and construction of six OP-AMP stations. The route is approximately 337 miles in length. The fiber optic facilities will be installed at an average depth of 42 inches primarily by trenching within paved road rights-of-way, plowing in road shoulders and directional boring where required.

Contact Information

Name
Nicolas Procos
Agency Name
Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles, Riverside, San Bernardino

Notice of Determination

Approving Agency
California Public Utilies Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print