West Mission Bay Drive Bridge Over Mission Bay Channel

2 Documents in Project

Summary

SCH Number
2001101033
Lead Agency
City of San Diego
Document Title
West Mission Bay Drive Bridge Over Mission Bay Channel
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2002
Present Land Use
Coastal Zone, Coastal Commission Jurisdiction, Public Right-of-way
Document Description
Seismic retrofit improvements to the existing bridges connecting the Quivira Basin area with the Mariner's Basin-Ventura Cove area, over Mission Bay Channel, in the southwestern portion of Mission Bay Regional Park. The proposal would include stabilization of the bridge without changes to the current footprint of the platform or height of the span. The proposed work would reinforce existing piers and join the paired piers together at the waterline to increase support under tangential and torsional loads during seismic events. The project would receive Federal Funds and also be subject to review under the National Environmental Policy Act (NEPA). The proposal would also require a State Coastal Development Permit.

Contact Information

Name
John Alabado
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
West Mission Bay Drive and Quivira Road
State Highways
I-8
Waterways
Mission Bay Channel/Pacific Ocean

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print