SB Jacoby Creek Bridge and NB Bri dge Rail and Tide Gate Replacement Projects (Eureka-Arcata Corridor Projects) (Lake or Streambed Alteration Agreement No . 160

8 Documents in Project

Summary

SCH Number
2001092035
Lead Agency
California Department of Transportation, District 1
Document Title
SB Jacoby Creek Bridge and NB Bri dge Rail and Tide Gate Replacement Projects (Eureka-Arcata Corridor Projects) (Lake or Streambed Alteration Agreement No . 160
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2019
Document Description
South Bound Bridge : Jacoby Creek (40 °50'36 .66"N, 124 °4'55.74"W): The 1920's bridge will be replaced by a 73-foot long by 43-foot wide , two lane bridge with standard shoulders and bridge rails . The bridge will clear span the Jacoby Creek channel , will be constructed approximately two feet higher than the previous deck height and will have an additional 300 square feet of surface area compared to the existing bridge . A detour bridge will be constructed in the median between the two existing bridges to form the temporary realignment. The temporary realignment onto the new median bridge allows demolition of the existing south bound Jacoby Creek Bridge. After the old bridge and abutments are removed and the new bridge abutments are installed, the detour bridge will be moved to the new location using the jack-and-slide method. See NOD for full details.

Contact Information

Name
Michael van Hattem
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
California Department of Transportation
Contact Types
Project Applicant

Location

Cities
Arcata, Eureka
Counties
Humboldt
Other Location Info
The project encompasses seven sites along and adjacent to (east side) of US Highway 101, between the cities of Eureka and Arcata , in the County of Humboldt, State of California,; Section 23, Township 5N, Range 1W; Mt. Diablo Base and Meridian , in the Arcata South, CA U.S. Geological Survey 7.5-minute quadrangle .

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print