Response Plan, 915 Antonio Street And 844 Alvarado Street Project

9 Documents in Project

Summary

SCH Number
2001092001
Lead Agency
City of San Leandro
Document Title
Response Plan, 915 Antonio Street And 844 Alvarado Street Project
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2020
Document Description
The Project consists of excavation and off-site disposal of impacted soil, installation of a vapor barrier and a soil vapor extraction system, as well as development of a Soil Monitoring Plan (SMP), a Dust Control Plan, and Soil Vapor Mitigation Plans. The Soil Monitoring Plan will direct how excavation due to construction activities will address hazardous materials including chloroform, tetrachloroethene (PCE), trichloroethene (TCE), 1,3 butadiene, and benzene. The Dust Control Plan includes the management of traffic associated with construction (trackout prevention, traffic control, and off-site transport. The Soil Vapor Mitigation Plans will describe installation a vapor mitigation system (VMS) which provides a preferential pathway for vapors that may be present in the vadose zone to be readily released to the atmosphere instead of migrating through the foundation slab and into indoor air. Activities to be conducted pursuant to the approved Response Plan include:

Contact Information

Name
Tenaya Tuteur
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Name
Agency Name
Maximus Antonio Alvarado, LLC
Contact Types
Project Applicant

Location

Cities
San Leandro
Counties
Alameda

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print