EP-008-012

2 Documents in Project

Summary

SCH Number
2001091066
Lead Agency
City of Riverside
Document Title
EP-008-012
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2002
Document Description
Initial Study of a joint proposal by the City of Riverside and the University of California Riverside (UCR) to construct the University Arroyo Flood Control and Enhancement Plan, and Islander Park Improvements Project. Major components of this proposed project include: 1) Two detention ponds within the City's Islander Park property, consisting of approximately 20.1 vacant acres located on the northerly side of Big Springs Road at its easterly terminus. This component includes approximately 5.3 acres of vacant, privately owned property proposed to be acquired by the City and 2.5 acres owned by the County of Riverside Parks and Open Space District; 2) Development of the Islander Park property with passive recreational improvements, including hiking trails, vista points and native vegetation. A one acre turf area is also proposed with related improvements including a dog park and tot lot. Lighting is proposed to be added to the existing parking lot; 3) A third detention pond on the UCR campus at the northerly terminus of the Botanical Garden tributary, immediately south of Visitors Parking lot 10; 4) Improvements within an approximately 1,100 foot long section of the main campus open channel along the south side of Big Springs Road, from Valencia Hill Drive westerly to just past the driveway entrance to Parking Lot 13. The existing channel will be cleared, regraded and revegetated with native plants; and 5) Modification to the Gage Basin outlet structure at the I-215 Freeway, northerly of University Avenue, to reduce peak outflows to volumes within the capacity of the City's downstream storm drain facilities.

Contact Information

Name
Craig Aaron
Agency Name
City of Riverside, Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Zip
92507-2521
State Highways
I-215
Railways
BNSF/Atchinson Topeka/S.P./ U.P.
Schools
Longfellow/University Heights/John W. North/Emerson/Hyatt/Gage
Waterways
Gage Canal
Township
2S
Range
4W
Base
SB
Other Location Info
University of California
Other Information
Section:19,20,29,30 Schools: Castleview, Lincoln, & Central

Notice of Determination

Approving Agency
Riverside City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print