Montecito Water District Ortega Reservoir Upgrade Project

3 Documents in Project

Summary

SCH Number
2001091055
Lead Agency
Montecito Water District
Document Title
Montecito Water District Ortega Reservoir Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
11/26/2001
Present Land Use
Reservoir/Existing Public or Private Park Recreation/Open Space
Document Description
Construction of a fixed structural roof cover for the 4.1 acre Ortega Reservoir, including certain related onsite and indirect interior reservoir surface improvements, grading, concrete demolition, concrete retaining wall construction, reservoir access and perimeter road widening, site surface drainage handling facilities, reservoir and control station inlet/outlet piping modifications, interior reservoir baffling system and other work as fully described in Ortega Reservoir Upgrade Project Initial Study, prepared by Padre and Associates, dated August 2001 necessary for the construction and operation of new fixed structural roof.

Contact Information

Name
Fred Adjarian
Agency Name
Montecito Water District
Contact Types
Lead/Public Agency

Location

Counties
Santa Barbara
Cross Streets
Ortega Ridge Road
Zip
93067
Total Acres
13.98
Parcel #
005-030-001
State Highways
101
Railways
Union Pacific
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Montecito Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print