Point Lobos State Reserve Sewer Connection

2 Documents in Project

Summary

SCH Number
2001091032
Lead Agency
Carmel Area Wastewater District (CAWD)
Document Title
Point Lobos State Reserve Sewer Connection
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2001
Present Land Use
Point Lobos State Reserve is part of the California State Parks system and is zoned Resource Conservation (Coastal Zone); Monastery Beach is zoned Outdoor Recreation (Coastal Zone); existing highway and Caltrans right-of-way.
Document Description
Wastewater will be gathered from six collection points and pumped to CAWD's sanitary sewer collection system near the intersection of Highway 1 and Ribera Road, in the Carmel Meadows subdivision. A public restroom will be installed at the Cypress Point site within the Reserve. There is an add-alternate item to the project that would allow for additional off-site wastewater to be connected to the proposed system. The only additions, which would be connected at a later date with separate environmental review, would be the Highlands Inn, the Tickle Pink Inn, and 14 private residences, all of which are currently on private sewer systems. This would entail upsizing the PPS and force main as a part of the current project.

Contact Information

Name
Sanford Veile
Agency Name
Carmel Area Wastewater District (CAWD)
Contact Types
Lead/Public Agency

Location

Counties
Monterey
Cross Streets
Ribera Road
State Highways
68/1
Waterways
Carmel River/ Pacific Ocean
Other Location Info
located in northwest Monterey County, California, on the Pacific coast. The proposed pipeline will run from individual connection points in the Reserve, to the Primary Pump Station (PPS) at the Gate House. From the PPS, the line will exit the Reserve and run northeast along Highway 1 to the Hudson House, Monastery Beach, and to the point of connection at Ribera Road.

Notice of Determination

Approving Agency
Carmel Area Wastewater District Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A