Del Mar Bluff Stabilization, Project 1

4 Documents in Project

Summary

SCH Number
2001091003
Lead Agency
North County Transit District
Document Title
Del Mar Bluff Stabilization, Project 1
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2001
Present Land Use
RR-Railroad Right-of Way
Document Description
The proposed project involves drainage improvements associated with the North County Transit District (NCTD) railroad right-of-way in the City of Del Mar in order to improve the seaside bluff stability, which is adjacent to the railroad tracks. The project also includes a slope monitoring system. The proposed subdrainage improvements are intended to be a part of a mid-term maintenance and preservation program (+ 20 years) to mitigate previously identified high-risk areas associated with drainage within NCTD right-of-way along the Del Mar bluffs. Subdrainage improvements include the use of interceptor trench drains and hydro-augers as well as the cleaning and rehabilitation of existing structures. Surface drainage improvements are also proposed within the NCTD right-of-way. Surface drainage improvements would consist of new and improved inlets, outlets, and culverts, as well as new ditches and improvements of existing ditches. The surface drainage improvements would consist of approximately 24 surface drainage projects. Lastly, the project would include the installation of a slope monitoring system. The monitoring system would provide early warning of both surface and subsurface movements along the railroad tracks in the project area. The warning system would stop trains entering the bluffs should a landslide endanger the tracks in a high risk area.

Contact Information

Name
Leslie Blanda
Agency Name
North County Transit District
Contact Types
Lead/Public Agency

Location

Cities
Del Mar
Counties
San Diego
Total Acres
1.6
State Highways
I-5, SR-56
Railways
Amtrak/NCTD
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
North County Transit District Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print