Streambed Alteration Agreement R3-2001-0466

Summary

SCH Number
2001089017
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement R3-2001-0466
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2001
Document Description
The project involves water drafting at twelve pre-existing sites, six tanks and six spring feed ponds. Water drafting will be confined between the dates of April 1 and October 15. Sites A, B, C, and D will draft water from non fish bearing watercourses that flow into the North Fork Usal Creek. Sites E, F, G, H, I, J, K, and L will draft water from nonfish bearing watercourses that flow into the South Fork Usal Creek. Water will be pumped at the identified sites into water trucks for daily timber harvest road watering activities. The California Department of Forestry and Fire Protection (CDF) is the Lead Agency under the CEQA review of this project, a Timber Harvest Plan (THP) 1-01-106 MEN. The plan area is located in the County of Mendocino, State of California, Sections 27, 26, 34, 36 of Township 24N, Range 18W; Sections 6, 7, 17, 18, 19 of Township 23N, Range 17W; Sections 14, 24, 25 of Township 23N, Range 18W; MDBM. The California Department of Fish and Game (Department) is executing a Lake and Streambed Alteration Agreement R3-2001-0466, pursuant to Section 1603 of the Fish and Game Code to the project applicant, Mr. Robert Ballard, Campbell Timberland Management, Inc., P.O. Box 1228, Fort Bragg, CA 95437.

Contact Information

Name
Stephen P. Rae
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Mendocino

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A