North Wetland Runoff Capture and Treatment Project

2 Documents in Project

Summary

SCH Number
2001081088
Lead Agency
City of Laguna Niguel
Document Title
North Wetland Runoff Capture and Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2001
Present Land Use
Vacant Land/Open Space/Open Space

Document Description
The project consists of the construction of a low flow inlet and piping system, parallel to the existing high-flow storm drains and slope terrace drains, which will divert gutter and v-ditch low-flow runoff from the Kite Hill subwatershed of the JO3P02 storm drain system. The low-flow runoff is diverted into a newly constructed natural treatment wetland to reduce pollutants in the runoff before it flows into the natural creek system. The North Wetland will be approximately 0.3 acre in total area, of which 0.2 acre would be a functional marsh, and will be constructed on existing County of Orange parkland open space within the Laguna Niguel Regional Park.

Contact Information
Jeff Gibson
City of Laguna Niguel
Lead/Public Agency
27781 La Paz Road
Laguna Niguel, CA 92677

Phone : (949) 362-4360

Location

Cities
Laguna Niguel
Counties
Orange
Cross Streets
Alizia Parkway and Kite Hill Drive N.
Zip
92677
Total Acres
1
Parcel #
654-061-02
Waterways
Aliso and Sulpher Creeks

Notice of Determination

Approving Agency
City of Laguna Niguel
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Laguna Niguel Community Development Department 27781 La Paz Road Laguna Niguel, CA 92677

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.