Time-Critical Removal Action Work Plan, Installation Restoration Site 5, Seal Beach Naval Weapons Station

3 Documents in Project

Summary

SCH Number
2001081037
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Time-Critical Removal Action Work Plan, Installation Restoration Site 5, Seal Beach Naval Weapons Station
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2001
Present Land Use
Industrial
Document Description
The proposed removal action includes the removal of soil (disposal fill material) and processing the soil through a mechanical shifting apparatus to separate ordinance items and construction debris. Shifted soil will be temporarily stockpiled at IR Site 5 and then relocated over time for beneficial reuse at other locations of the site. The discovered live ordinance will be detonated on site under the direction of Navy EOD personnel. All inert materials, debris and scrap metal will be sent to off-site disposal facilities.

Contact Information

Name
Katherine Leibel
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Seal Beach
Counties
Orange
Cross Streets
Seal Beach Blvd. and Westminster Avenue
Zip
90740-5000
Total Acres
4
State Highways
405
Waterways
Pacific Ocean and Anaheim Bay

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A