Approval of Construction and Operation of 700 Foot Natural Gas Pipeline Connection Between Sutter Energy Center and Greenleaf I Facility (97-AFC-2C)
Summary
SCH Number
2001078467
Public Agency
California Energy Commission
Document Title
Approval of Construction and Operation of 700 Foot Natural Gas Pipeline Connection Between Sutter Energy Center and Greenleaf I Facility (97-AFC-2C)
Document Type
NOE - Notice of Exemption
Received
Posted
7/23/2001
Document Description
Change the Sutter Power Project to add a new 8 inch diameter, 700 foot gas pipeline to be installed connecting the Greenleaf 1 facility and the Sutter Energy Center. This will provide a dual source of fuel from the Montis Niger pipeline and PG&E line 302, and thereby enhance fuel availability for both projects.
Contact Information
Name
Steve Munro
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Yuba City
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
Sec. 15303
Reasons for Exemption
Energy Commission staff have analyzed the proposed pipeline construction and operation and conclude that this modification has no potential for adverse environmental or public health and safety impacts.