West Shore Bike Path Project: Homewood Area

4 Documents in Project

Summary

SCH Number
2001072089
Lead Agency
Tahoe City Public Utility District
Document Title
West Shore Bike Path Project: Homewood Area
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2012
Present Land Use
Recreation/Residential
Document Description
The project consists of constructing a multi-purpose trail generally following SR 89 through a portion of the Homewood community on the west shore of Lake Tahoe. The trail segment would be approximately 5,040 feet (0.95 mile) in length and would be constructed between post miles 2.2 and 3.1, connecting two existing segments of Class 1 trail. The Class 1 trail would be 12 feet wide, consisting of 8 feet of pavement (two 4-foot striped lanes) and 2-foot unpaved graded shoulders on either side. Crosswalks would be striped at trail crossings on Fern Street, Oak Street, Trout Street, Silver Street, and Fawn Street. Between Oak Street and Trout Street, the trail would run over a 60-foot bridge constructed to span Madden Creek.

Contact Information

Name
Jack Beckman
Agency Name
Tahoe City Public Utility District
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Cherry, Fawn, Silver, Highway 89
Total Acres
<2
State Highways
89
Schools
Rideout
Waterways
Lake Tahoe, Madden Creek
Township
14N
Range
16E
Section
1
Other Location Info
Homewood

Notice of Determination

Approving Agency
Tahoe City Public Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.