Yuba-Feather Flood Protection Program

3 Documents in Project

Summary

SCH Number
2001072062
Lead Agency
Yuba County Water Agency
Document Title
Yuba-Feather Flood Protection Program
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2004
Present Land Use
Recreation/public / Undeveloped/recreation; agricultural-rural residential, TPZ/public, foothill agriculture, timber production / agriculture/exclusive agricultural zone/valley agriculture.
Document Description
The project involves three separate flood control elements: (1) forecast-coordinated flood control operations of New Bullards Bar Reservoir on the North Yuba River and Lake Oroville on the Feather River, which would strengthen flood protection for the Yuba-Feather River system by improving flood forecasts and enhancing flood control operations and efficiency; (2) an increase of the outlet capacity of New Bullards Bar Reservoir by adding a new upper-level outlet at New Bullards Bar Dam to increase flood-release capability during major storms; and (3) the construction of a Feather River levee setback by relocating the east Feather River levee for 8.6 miles into two segments between Shanghai Bend and the Bear River and removing most of the existing levee in those segments.

Contact Information

Name
Curt Aikens
Agency Name
Yuba County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Marysville, Oroville
Counties
Butte, Yuba
Waterways
Yuba River, Feather River, Bear River

Notice of Determination

Approving Agency
Yuba County Water Agency Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A