Claremont Tunnel Seismic Upgrade Project

2 Documents in Project

Summary

SCH Number
2001072030
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Claremont Tunnel Seismic Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2001
Present Land Use
Claremont Center (Oakland/Berkeley) - Water transmission facilities surrounded by residential uses and school/Single Family Residential. Orinda - Water treatment/transmission facilities surrounded by Residential Open Space and recreational uses/Public
Document Description
Construction of seismic upgrades for East Bay Municipal Utilities District (EBMUD) Claremont Tunnel including a 9-foot (ft) diameter by 1,500-ft long bypass tunnel with an 8-ft by 80-ft long protective pipe; 9-ft diameter by 700-ft long access tunnel; entry portal and grout injection reinforcement of the existing tunnel lining, temporary contractor staging and equipment storage areas.

Contact Information

Name
David F. Tsztoo
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Berkeley, Oakland, Orinda
Counties
Alameda, Contra Costa
Cross Streets
Hwy 24 (Berkeley/Oakland), Camino Pablo Rd. (Orinda)
State Highways
24 & 13
Railways
BART - Concord Line
Schools
Rock LaFleche, Chabot Elementary
Waterways
Temescal Creek (Berkeley/Oakland) & San Pablo Creek (Orinda)

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print