Walsh Timber Co. SMP-17-001

3 Documents in Project

Summary

SCH Number
2001072011
Lead Agency
Humboldt County
Document Title
Walsh Timber Co. SMP-17-001
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2017
Present Land Use
Timber Production and Existing Rock Quarry Timber Production Zone (TPZ) Timber Production
Document Description
Renewal of a 15-year permit term for a previously approved rock quarry surface mining operation which has been permitted and operating for the past 25 years. The project includes renewal of a CUP, Surface Mining Permit, Reclamation Plan, and review of financial assurance cost estimates for a surface mining operation involving an open pit upland rock quarry with a proposed total extraction of 90,000 cubic yards over a 15-year period from an open pit mine. The method of surface rock removal will involve the use of explosives and an air track drill spaced on an 8' - 10' grid pattern back from the rock face. Other equipment to be used include a "cat 966 loader", a "cat D-7 crawler", and a grizzly dry screen sorter. Rock products will be hauled by end-dump trucks. Truck trips are estimated at an average daily traffic of five.

Contact Information

Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
Tompkins Hill Road and Graham Way
Zip
95503
Total Acres
2.5
Parcel #
311-081-05
State Highways
101
Waterways
Salmon Creek
Township
3N
Range
1E
Section
18
Base
HM

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print