Walsh Timber Corporation Upland Rock Quarry APN 311-081-05 (Salmon Creek Area); Case Nos.: CUP-00-39/SMP-00-06/RP-00-06
3 Documents in Project
Summary
SCH Number
2001072011
Lead Agency
Humboldt County
Document Title
Walsh Timber Corporation Upland Rock Quarry APN 311-081-05 (Salmon Creek Area); Case Nos.: CUP-00-39/SMP-00-06/RP-00-06
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2001
Present Land Use
Timber Production and Existing Rock Quarry
Timber Production Zone (TPZ)
Timber Production
Document Description
A new 15-year permit term for a previously approved rock quarry surface mining operation which has been permitted and operating for the past ten years. The project includes a Conditional Use Permit, Surface Mining Permit, Reclamation Plan, and review of financial assurance cost estimates for a surface mining operation involving an open pit upland rock quarry with a proposed total extraction of 90,000 cubic yards over a 15-year period from an open pit mine. The method of surface rock removal will involve the use of explosives and an air track drill spaced on an 8'-10' grid pattern back from the rock face. Other equipment to be used includes a "cat 966 loader", a "cat D-7 crawler", and a grizzly dry screen sorter. Rock products will be hauled by end-dump trucks. Truck trips are estimated at an average daily traffic increase of five. Aggregate production will be conducted by a three man crew on a demand basis and portable toilet facilities will be provided for on site employees.
Contact Information
Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency
Phone
Location
Cities
Eureka
Counties
Humboldt
Cross Streets
Tompkins Hill Road and Graham Way
Zip
95503
Total Acres
2.5
Parcel #
311-081-05
State Highways
101
Waterways
Salmon Creek
Township
3N
Range
1E
Section
18
Base
HM
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.