Saticoy Groundwater Storage Management Project

3 Documents in Project

Summary

SCH Number
2001071110
Lead Agency
United Water Conservation District
Document Title
Saticoy Groundwater Storage Management Project
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2001
Present Land Use
Open Space/Mineral Resource Protection
Document Description
The proposed project involves development of up to six new groundwater extraction wells in the Upper Aquifer in order to produce an average of 5,900 acre feet per year (AF/Y). Initially, the project involves construction of four new wells. Construction activities would be phased over a 15-month period. Two additional wells would not be drilled at this time but are planned in order to ensure that the extraction objectives are met and to provide greater management flexibility within the conjunctive use system.

Contact Information

Name
John Dickenson
Agency Name
United Water Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Cross Streets
State Route 118 and State 232
Total Acres
150
Parcel #
109-101-035,070,065
State Highways
SR118; SR232
Railways
VCTC Santa Paula Branch Line
Schools
Saticoy, Mesa and Rio Mesa
Waterways
Santa Clara River

Notice of Determination

Approving Agency
United Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print