Lower Presidio Trail and Pedestrian Bridge

2 Documents in Project

Summary

SCH Number
2001071046
Lead Agency
City of Monterey
Document Title
Lower Presidio Trail and Pedestrian Bridge
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2003
Present Land Use
Vacant R-1-6, O (Open Space) Parks, Recreation and Open Space: Residential Medium Density
Document Description
The City of Monterey proposes to construct an asphalt concrete (AC) pedestrian trail linking Van Buren Street to Pacific Street and an AC pedestrian trail bridge linking Van Buren Street to Artillery Street and the Presidio of Monterey. The proposed trail begins at the terminus of Van Buren Street and continues north for approximately 82 feet (25 meters) before the trail splits, with one trail continuing north toward Artillery Street for approximately 246 feet (75 meters). In two locations near the split in the trail, the proposed trail passes over gullied channels that carry runoff from Van Buren Street to the seasonal creek. Culverts are proposed to be placed under the trails in these locations to carry the runoff. A 50-foot (15-meter) pedestrian bridge with concrete abutments is proposed on the northerly trail, which would cross over the seasonal creek approximately 20 feet (meters) south of Artillery Street. The U.S. Army has filed an Environmental Assessment Finding of No Significant Impact (June 1996) and Section 106 clearance to address the portion of the project site owned by the federal government. The City of Monterey is filing this initial study for the entire project area.

Contact Information

Name
Bill Fell
Agency Name
City of Monterey
Contact Types
Lead/Public Agency

Location

Cities
Monterey
Counties
Monterey
Cross Streets
Van Buren Street and Artillery Street
Zip
93940
Total Acres
1
Parcel #
001-551-001
Schools
Larkin School
Waterways
Intermittent Stream

Notice of Determination

Approving Agency
City of Monterey
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print